    b3kat_BV046874286
    Format: 1 Online-Ressource (XI, 340 p. 61 illus)
    Edition: 1st ed. 2002
    ISBN: 9783662223413
    Series Statement: Lecture Notes in Economics and Mathematical Systems 508
    Content: A project is a unique undertaking or endeavor to be accomplished that can be divided into individual subtasks or activities each of which requires time and scarce resources for its completion. Also there is a desired objective to be attained (for example, minimization of project duration or of variation of resource utilization, or maximization of net present value of the project). Moreover, there are given precedence relationships among activities prescrib­ ing the order in which activities must be carried out. Project scheduling, in its basic form, consists of finding start times for all activities such that pre­ scribed resource and precedence constraints are satisfied and an objective function is optimized. Since the concept of a project can be interpreted quite broadly, project scheduling problems arise in a great variety of practical situations. These in­ clude construction work, the development and introduction of new products, service systems, or software packages, strategic long-term planning in manu­ facturing and the service sector, emergency planning, and even the conduct­ ing of political campaigns. Recently, project scheduling has been successfully applied to production and operations management, e.g. make-to-order pro­ duction in manufacturing and batch production in process industries. Since the late 1950's, network-based planning methods for project sched­ uling problems have been developed, cf. Elmaghraby (1977) and Moder et al
    Additional Edition: Erscheint auch als Druck-Ausgabe ISBN 9783540424635
    Additional Edition: Erscheint auch als Druck-Ausgabe ISBN 9783662223420
    Language: English
    Subjects: Economics , Mathematics
    RVK:
    RVK:
    Keywords: Ressourcen ; Knappheit ; Projektplanung ; Mathematisches Modell ; Projektplanung ; Optimierung ; Nebenbedingung
    URL: Volltext  (URL des Erstveröffentlichers)
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
  • 2
    UID:
    gbv_751287113
    Format: Online-Ressource (XI, 340 p) , digital
    Edition: Springer eBook Collection. Business and Economics
    ISBN: 9783662223413
    Series Statement: Lecture Notes in Economics and Mathematical Systems 508
    Content: The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, cost of resources purchased or rented, or variation of resource utilization over time. A structural analysis of the different project scheduling problems is given and many exact and heuristic solution procedures with detailed performance analysis are presented, which exploit the specific problem structure. Moreover, some interesting applications to make-to-order production and batch production in process industries are investigated
    Additional Edition: ISBN 9783540424635
    Additional Edition: Erscheint auch als Druck-Ausgabe ISBN 9783540424635
    Additional Edition: Erscheint auch als Druck-Ausgabe ISBN 9783662223420
    Language: English
    URL: Volltext  (lizenzpflichtig)
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Did you mean 9783642223020?
Did you mean 9783642225420?
Did you mean 9783642223426?
Close ⊗
This website uses cookies and the analysis tool Matomo. Further information can be found on the KOBV privacy pages