In:
Review of Scientific Instruments, AIP Publishing, Vol. 83, No. 2 ( 2012-02-01)
Abstract:
The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target/ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 °C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.
Type of Medium:
Online Resource
ISSN:
0034-6748
,
1089-7623
Language:
English
Publisher:
AIP Publishing
Publication Date:
2012
detail.hit.zdb_id:
209865-9
detail.hit.zdb_id:
1472905-2
SSG:
11