During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
Materialart:
Online-Ressource
ISSN:
2195-7045
DOI:
10.1140/epjti/s40485-023-00100-w
Sprache:
Englisch
Verlag:
Springer Science and Business Media LLC
Publikationsdatum:
2023
ZDB Id:
2769516-5