Your email was sent successfully. Check your inbox.

An error occurred while sending the email. Please try again.

Proceed reservation?

Export
  • 1
    UID:
    kobvindex_INT51281
    Format: 1 online resource (156 pages)
    Edition: 1st ed.
    ISBN: 9783110347876
    Series Statement: Schriftenreihe Bauökonomie Series v.1
    Note: Intro -- Table of Contents -- List of Abbreviations -- List of Figures -- List of Tables -- Abstract -- Zusammenfassung -- 1 Introduction -- 1.1 Research Background -- 1.2 Problem Statement -- 1.3 Scope, Aims, and Hypotheses -- 1.4 Structure of the Manuscript -- 2 Literature Review -- 2.1 Construction Cost Estimation -- 2.2 Construction Duration Estimation -- 3 Methodology -- 3.1 The Empirical Work -- 3.2 Linear regression -- 3.3 Artificial Neural Networks -- 3.4 Concluding Remarks -- 4 Sample -- 4.1 Overview -- 4.2 Restrictions and Predictor Variables -- 4.3 Response Variables -- 4.4 Supporting the Hypotheses - Pilot Analysis -- 4.5 Concluding Remarks -- 5 Results of Analysis -- 5.1 Reference Unit Quantities -- 5.2 Cost of Structure -- 5.3 Construction Duration -- 6 Comparison of the Frameworks -- 6.1 Cost Estimation Frameworks -- 6.2 Duration Estimation Frameworks -- 7 Implementation -- 7.1 Story of 1300-082 -- 7.2 Point Estimates -- 7.3 Confidence Intervals -- 8 Conclusions -- References
    Additional Edition: Print version Dursun, Onur Early Estimation of Project Determinants Basel/Berlin/Boston : Walter de Gruyter GmbH,c2013 ISBN 9783110346381
    Language: English
    Keywords: Electronic books ; Electronic books
    URL: FULL  ((OIS Credentials Required))
    URL: FULL  ((OIS Credentials Required))
    Library Location Call Number Volume/Issue/Year Availability
    BibTip Others were also interested in ...
Close ⊗
This website uses cookies and the analysis tool Matomo. Further information can be found on the KOBV privacy pages